Geological project management V-Bahn
Grindelwald, Berner Oberland
46° 34′ 30″ N, 7° 58′ 31″ E
2012 - today
The new alpine infrastructure facilities of Jungfrau Railways include a 3S cableway and a mountain station (EigerExpress) with two connecting tunnels to the Eiger-glacier station at 2,320 m above sea level, as well as a terminal and underground car park on the valley floor.
The complex geological conditions in the project area had to be studied, continuously assessed and technically managed. In particular, a large-scale permanent landslide and a lithological contact zone with soft clay shale and hard high-alpine limestone presented a considerable challenge.
A large-scale permanent landslide and a lithological contact zone with soft clay shale and hard high-alpine limestone presented a considerable challenge.
GEOTEST was able to apply its wide-ranging expertise in this future-oriented project: from projections for rock removal, to geological-geotechnical construction supervision and deformation modelling of the excavation pit, to contamination investigations, all aspects of the subsurface have been examined. All project and monitoring steps were recorded and evaluated with the FeldApp mobile app developed by GEOTEST.
The high-alpine construction site is also at risk from rockfall, avalanches and glacial erosion. For this reason, protective structures and complex surveillance and alarm systems were designed and installed.
Client